Resource Center · Reports

R-04White paperResource Center

How to read a COI against contract requirements, line by line

Most certificate reviews check whether boxes are filled in. A real review checks each box against what the contract asked for. Here is the method, box by box.

Docket COIJ-26-0005November 13, 20263 min read

By The editors, COI Journal ·

The questionHow do I read a certificate of insurance to check whether a contractor's coverage meets our contract requirements?

Key findings

  1. Start from the contract, not the certificate. Write the requirements down per trade, then read the certificate against that list.
  2. Check every box for three things: present, sufficient and current.
  3. Since the 2025/12 edition, the ACORD 25 lets brokers show limits at the amount the holder requested, so a certificate may not show the full policy limit.
  4. The checkboxes for additional insured and waiver of subrogation are claims. Ask for the endorsements that back them.

Start from the contract

The most common review mistake happens before anyone looks at the certificate. The reviewer checks it against a general idea of what "good coverage" looks like instead of against what this contract, for this trade, on this project actually requires.

So step one is a list. For each trade on each project, write down every requirement from the subcontract's insurance section: each coverage, each limit, each endorsement, how long completed operations must last, who must be named, and any carrier rating. That list is the answer key. The certificate is the test.

For every line, ask three questions:

  1. Present. Does the certificate show it at all?
  2. Sufficient. Does it meet the number or wording the contract asks for?
  3. Current. Is it in force for the whole time the contract needs it?

The top of the form

Date. The date the certificate was issued. Coverage can change after this date without the paper changing. See notice of cancellation.

Producer. The broker or agent who issued the certificate. This is who you call with questions and endorsement requests.

Insured. The company that holds the policies. Check that it is the same legal entity that signed your subcontract. A sister company, a parent, or a similar name is a mismatch.

Insurers A to F. The carriers, with NAIC numbers. If your contract requires a minimum carrier rating, check each carrier against it. You can also confirm a carrier is licensed in your state through the NAIC's Consumer Insurance Search.

The coverage grid

Type of insurance. General liability, auto, umbrella or excess, workers' comp and employer's liability, plus any other lines your contract names. Missing lines fail the "present" test.

ADDL INSD and SUBR WVD. Single-letter columns for additional insured and waiver of subrogation. A Y is a statement, not an endorsement. The form itself says that if the holder is an additional insured, the policy must have additional insured provisions or be endorsed, and that a waiver may require an endorsement. Ask for the endorsements. See additional insured and waiver of subrogation.

Policy number and dates. Check that each policy is in force when the work starts and note when it expires. A policy that ends mid-project needs a renewal certificate before that date.

Limits. Compare each limit with the contract. Check per occurrence, general aggregate, products and completed operations aggregate, and the umbrella. If the contract requires a per project aggregate, look for it and ask for the endorsement.

One recent change matters here. The 2025/12 edition of the ACORD 25 adds a sentence saying limits shown are inclusive of amounts requested by the certificate holder and may not reflect policy limits in excess of those requested, Big I New York reported. In practice, a certificate may now show the limit your contract asked for rather than the full policy limit. Big I New York and the national Big I still recommend that agencies show policy limits, according to IIABA. Either way, a limit at or above your requirement passes your check. Just don't read it as the policy's ceiling.

The description box

The "Description of operations / locations / vehicles" box is where brokers note the project, the additional insureds and special wording like "primary and noncontributory." Treat everything here as a pointer. Wording in the box doesn't change the policy. It tells you which endorsements to ask for.

The bottom of the form

Certificate holder. Should be your company, with the correct legal name and address.

Cancellation. The form says notice of cancellation will be delivered in accordance with the policy provisions. That's not a promise to notify you. Track expiration dates yourself.

A one-page worksheet

For each requirement on your list, record: requirement, what the certificate shows, present (yes or no), sufficient (yes or no), current until (date), and the endorsement you've received (form number and edition). Any "no," and any endorsement still missing, is a deficiency to send back to the trade and its broker. Our deficiency workflow covers how to send it so it gets fixed.

How we wrote this

This is a qualitative method paper built from the layout and text of the ACORD 25 (2025/12) and reporting on that edition by Big I New York and the Independent Insurance Agents & Brokers of America. General information, not legal or insurance advice.

Sources

  1. ACORD 25 Certificate of Liability Insurance (2025/12), as posted by the New York State Department of Financial Services, ACORD / NY DFS
  2. ACORD Changes Limits Wording on Certificate of Insurance, Big I New York, March 10, 2026
  3. Input from ACORD Regarding Recent Changes to the ACORD 25, Independent Insurance Agents & Brokers of America, July 7, 2026

General information, not legal or insurance advice. Read your contracts and policies with your broker or attorney. COI Journal is published by Forsured, which sells construction insurance compliance software. How we keep editorial separate.

More from Reports

R-13White paperResource Center

What to require from any COI tool: a vendor-neutral specification

We don't rank software. But we can tell you what to ask for. This is a specification any COI tool, service or spreadsheet process can be measured against, with a way to test each line yourself.

Docket COIJ-26-0014November 13, 20262 min read

R-01White paperResource Center

A certificate is not coverage: six ways contractor COIs fail project requirements

The certificate is the one document everyone collects and almost nobody can rely on by itself. Here is where it breaks, in the order we would check it.

Docket COIJ-26-0002November 13, 20266 min read

R-20Analyst briefResource Center

Two public owners, two insurance exhibits: Oregon DOT and Sonoma County compared

Public owners publish their insurance requirements, which makes them a rare window into how requirements are actually written. We read two side by side.

Docket COIJ-26-0021November 13, 20262 min read

New reports in The COI Digest

Get The COI Digest

Worth Reading, our picks of the week's best construction insurance reporting, plus one term and one gap. Tuesday mornings, five minutes.

By subscribing, you agree to Forsured's Terms of Service and Privacy Policy. Unsubscribe from any email.

From our publisher

Check a contractor COI against your project requirements, free.

Forsured, which publishes COI Journal, will read one project's requirements and a contractor COI or two, and show you every gap it finds.