Published by Forsured Worth Reading in your inbox, every Tuesday
COI Journal

Construction insurance compliance, reported. The resource center for contractor COIs.

Resource Center · Reports

R-08White paperResource Center

The broker's side of the COI: why requests pile up and how to answer deficiency notices

For a construction broker, every new job a client wins means another round of certificates, endorsements and deficiency notices. Most of the load is predictable. Here is where it comes from and how to get ahead of it.

Docket COIJ-26-0009November 13, 20262 min read

By The editors, COI Journal ·

The questionAs an insurance broker, how do I handle constant COI and endorsement requests and deficiency notices from contractor clients on construction jobs?

Key findings

  1. Certificate and endorsement requests multiply with every project a contractor client wins, every renewal and every GC with its own exhibit.
  2. Most deficiency notices fall into a few repeat categories: a missing endorsement, a limit below the requirement, missing completed operations, a wrong name, or an expired policy.
  3. The ACORD 25 (2025/12) lets certificates show limits at the amount the holder requested; industry groups still recommend showing policy limits. Either way, mismatched expectations create rework.
  4. Brokers who keep a library of each client's endorsements, and send them with the certificate, answer most notices before they're sent.

Where the load comes from

A contractor client with a dozen active jobs may answer to a dozen GCs, each with its own insurance exhibit, its own certificate holder name and its own idea of what proof looks like. Every new job, every renewal and every change in a GC's requirements produces another round of requests.

The requests come in three kinds:

  1. Certificates for a new project or a new certificate holder.
  2. Endorsements, because the GC has learned that a checked box isn't proof. See additional insured.
  3. Deficiency notices, when the GC's review finds something that doesn't match.

The third kind is the expensive one. Each notice means reading the GC's requirement, comparing it with the policy, and either fixing the coverage, fixing the paper, or explaining why the requirement is already met.

The repeat deficiencies

Most notices fall into a few categories. Knowing them is most of the cure.

  • Missing endorsement. The certificate shows a Y for additional insured or waiver of subrogation, and the GC asks for the form. Fix: send the endorsement with every certificate, by default.
  • Missing completed operations. The client has an ongoing operations endorsement and nothing for completed operations. Fix: check whether the policy carries a completed operations form, ISO CG 20 37 or an automatic form like CG 20 39 or CG 20 40, or the carrier's equivalent. See completed operations.
  • Limits below requirement. The GC's exhibit asks for more than the policy has, often on the umbrella. Fix: an umbrella increase, or a conversation with the GC about whether the limit is negotiable.
  • Wording requirements. Primary and noncontributory, per project aggregate or a waiver on workers' comp that the policy doesn't carry. Fix: add the endorsement if the carrier will, or say plainly that it isn't available.
  • Names and dates. A wrong certificate holder name, an insured name that doesn't match the subcontract, or a policy that has expired. Fix: a clean master record per client and per GC.

The limits wording change

The 2025/12 ACORD 25 adds language saying limits shown are inclusive of amounts requested by the certificate holder and may not reflect policy limits above those amounts, Big I New York reported. ACORD described the language as permissive, not mandatory, according to IIABA. Big I New York and the national Big I recommend continuing to show the limits in the policy declarations.

For a broker, the practical point is consistency. Pick an agency practice, follow it on every certificate, and be ready to explain it when a GC asks why a certificate shows a different number than last time.

Getting ahead of the notices

  1. Keep a per-client endorsement library. Every endorsement on every policy, with form number and edition date, ready to attach.
  2. Keep a per-GC requirements file. When a client works for the same GC again, you already know the exhibit.
  3. Compare before you issue. Read the GC's exhibit against the policy before you send the certificate, and flag what won't pass to the client, not the GC.
  4. Send the package, not the page. Certificate plus every endorsement the exhibit requires, in one send.
  5. Answer deficiencies in the GC's terms. Quote the requirement, then show the form or the policy wording that meets it.

Our deficiency workflow describes the same loop from the GC's side.

How we wrote this

This qualitative paper draws on the ACORD 25 form text and reporting by Big I New York and IIABA on the 2025/12 edition. It describes common patterns, not measured frequencies. General information, not legal or insurance advice.

Sources

  1. ACORD 25 Certificate of Liability Insurance (2025/12), as posted by the New York State Department of Financial Services, ACORD / NY DFS
  2. ACORD Changes Limits Wording on Certificate of Insurance, Big I New York, March 10, 2026
  3. Input from ACORD Regarding Recent Changes to the ACORD 25, Independent Insurance Agents & Brokers of America, July 7, 2026

General information, not legal or insurance advice. Read your contracts and policies with your broker or attorney. COI Journal is published by Forsured, which sells construction insurance compliance software. How we keep editorial separate.

More from Reports

R-13White paperResource Center

What to require from any COI tool: a vendor-neutral specification

We don't rank software. But we can tell you what to ask for. This is a specification any COI tool, service or spreadsheet process can be measured against, with a way to test each line yourself.

Docket COIJ-26-0014November 13, 20262 min read

R-03White paperResource Center

Why every trade sends a certificate: the COI's job in construction risk transfer

General contractors pass risk down the contract chain to the trades doing the work. The certificate is the receipt for that handoff. Here is how the system works, and where the receipt stops being proof.

Docket COIJ-26-0004November 13, 20263 min read

R-01White paperResource Center

A certificate is not coverage: six ways contractor COIs fail project requirements

The certificate is the one document everyone collects and almost nobody can rely on by itself. Here is where it breaks, in the order we would check it.

Docket COIJ-26-0002November 13, 20266 min read

New reports in The COI Digest

Get The COI Digest

Worth Reading, our picks of the week's best construction insurance reporting, plus one term and one gap. Tuesday mornings, five minutes.

By subscribing, you agree to Forsured's Terms of Service and Privacy Policy. Unsubscribe from any email.

From our publisher

Check a contractor COI against your project requirements, free.

Forsured, which publishes COI Journal, will read one project's requirements and a contractor COI or two, and show you every gap it finds.