Published by Forsured Worth Reading in your inbox, every Tuesday
COI Journal

Construction insurance compliance, reported. The resource center for contractor COIs.

Resource Center · Reports

R-03White paperResource Center

Why every trade sends a certificate: the COI's job in construction risk transfer

General contractors pass risk down the contract chain to the trades doing the work. The certificate is the receipt for that handoff. Here is how the system works, and where the receipt stops being proof.

Docket COIJ-26-0004November 13, 20263 min read

By The editors, COI Journal ·

The questionWhat is a certificate of insurance, and why do general contractors require one from every trade contractor?

Key findings

  1. A construction project moves risk down the contract chain: the owner to the general contractor, the general contractor to each trade. Insurance requirements are how that transfer gets funded.
  2. The certificate of insurance is the trade's broker summarizing, on a standard form, the coverage the trade says it carries.
  3. GCs collect one from every trade because an uninsured or underinsured trade's losses tend to land on the GC, the GC's policy and the project.
  4. The ACORD 25 says it confers no rights on the holder. The certificate starts verification. The endorsements finish it.

Risk runs downhill

Every construction project is a chain of contracts. The owner hires a general contractor. The general contractor hires trades: electrical, drywall, roofing, concrete, steel. Each contract says who carries which risk.

The usual rule is simple. Whoever controls the work carries the risk of that work. A roofer is responsible for the roof, its crew and the damage its work causes. The general contractor's job is to make sure that, when a roofer's loss happens, the roofer's insurance pays it, not the GC's policy, not the owner's and not the GC's balance sheet.

That is risk transfer. Contracts assign the risk. Indemnity clauses promise to cover it. Insurance requirements make sure there is money behind the promise.

What the requirements ask for

Most subcontracts carry an insurance section, often an exhibit, that tells the trade what coverage to carry for the job. The common pieces:

  • Commercial general liability, with per occurrence and aggregate limits.
  • Additional insured status for the GC and usually the owner, during the work and after it. See additional insured.
  • Primary and noncontributory wording, so the trade's policy pays first. See primary and noncontributory.
  • Waivers of subrogation, so the trade's carrier can't turn around and sue the GC. See waiver of subrogation.
  • Workers' comp and employer's liability, auto liability and an umbrella or excess policy above the primary limits.

Our field guide to subcontract insurance requirements goes through each one.

Where the certificate comes in

The trade doesn't hand over its policies. Policies run to dozens of pages and change at every renewal. Instead, the trade's broker issues a certificate of insurance, almost always on the ACORD 25 form in the United States.

The certificate lists the insurers, policy numbers, effective and expiration dates, the limits, and checkboxes for additional insured and waiver of subrogation. It names the certificate holder, usually the GC, and has a description box for the project and any special wording.

For a GC managing dozens of trades on dozens of jobs, that one page is the only practical way to see everyone's coverage at a glance. That's why every trade sends one, and why no trade gets on site without one.

Why one from every trade

A GC asks every trade for a certificate because the trades it can't see are the ones that cost it most. If a trade is uninsured, or insured for less than the job needs, its losses look for another pocket. On a construction site, the nearest pocket is usually the GC's.

Some of the ways that happens:

  • An injured worker of an uninsured trade looks to the GC and the GC's policy.
  • Property damage caused by a trade's work becomes a claim on the GC's policy, which can raise the GC's premium at renewal.
  • An owner who required coverage that a trade didn't carry may look to the GC to make up the difference.

Collecting a certificate from every trade, on every job, before work starts, is the first line of defense against all three.

What the certificate can't do

The certificate's own text sets the limit on what it proves. The ACORD 25 says it "is issued as a matter of information only and confers no rights upon the certificate holder," and that it "does not affirmatively or negatively amend, extend or alter the coverage afforded by the policies below." It also warns that if the holder is an additional insured, the policy must have additional insured provisions or be endorsed.

In plain terms: the certificate describes coverage. The policy and its endorsements create it. When the two disagree, the policy wins.

So a certificate is the start of verification, not the end of it. Our white paper A certificate is not coverage lays out the six ways certificates fail project requirements and what to check for each.

The short version for a new project manager

  1. The subcontract says what insurance the trade must carry.
  2. The certificate is the trade's broker saying the trade carries it.
  3. The endorsements are the proof.
  4. Collect all three before the trade starts, and again every time a policy renews.

How we wrote this

This is a qualitative paper built from the text of the current ACORD 25 form and the standard ISO endorsement numbers in the COI Dictionary. It contains no survey data. General information, not legal or insurance advice.

Sources

  1. ACORD 25 Certificate of Liability Insurance (2025/12), as posted by the New York State Department of Financial Services, ACORD / NY DFS

General information, not legal or insurance advice. Read your contracts and policies with your broker or attorney. COI Journal is published by Forsured, which sells construction insurance compliance software. How we keep editorial separate.

More from Reports

R-13White paperResource Center

What to require from any COI tool: a vendor-neutral specification

We don't rank software. But we can tell you what to ask for. This is a specification any COI tool, service or spreadsheet process can be measured against, with a way to test each line yourself.

Docket COIJ-26-0014November 13, 20262 min read

R-08White paperResource Center

The broker's side of the COI: why requests pile up and how to answer deficiency notices

For a construction broker, every new job a client wins means another round of certificates, endorsements and deficiency notices. Most of the load is predictable. Here is where it comes from and how to get ahead of it.

Docket COIJ-26-0009November 13, 20262 min read

R-01White paperResource Center

A certificate is not coverage: six ways contractor COIs fail project requirements

The certificate is the one document everyone collects and almost nobody can rely on by itself. Here is where it breaks, in the order we would check it.

Docket COIJ-26-0002November 13, 20266 min read

New reports in The COI Digest

Get The COI Digest

Worth Reading, our picks of the week's best construction insurance reporting, plus one term and one gap. Tuesday mornings, five minutes.

By subscribing, you agree to Forsured's Terms of Service and Privacy Policy. Unsubscribe from any email.

From our publisher

Check a contractor COI against your project requirements, free.

Forsured, which publishes COI Journal, will read one project's requirements and a contractor COI or two, and show you every gap it finds.