What goes into subcontract insurance requirements: a field guide for GCs and brokers
Every subcontract insurance exhibit is built from the same parts. This guide walks through each one, what it's for, and how two public owners actually wrote theirs.
By The editors, COI Journal ·
The questionWhat insurance requirements do general contractors typically put in subcontract agreements?
Key findings
- Most subcontract insurance exhibits cover the same ground: coverages and limits, additional insured status, primary and noncontributory wording, waivers of subrogation, completed operations duration, carrier quality, and how proof is delivered.
- Limits often scale with the job. Sonoma County's published construction template sets general liability limits by project size, from $1 million per occurrence under $1 million to $10 million at $10 million and up.
- Good exhibits name the endorsement forms. Oregon DOT's subcontractor exhibit names CG 20 10 and CG 20 37 or equivalent and requires the endorsements with the certificate.
- Sonoma County's template says a certificate alone is not sufficient evidence of additional insured or primary and noncontributory status.
Why the exhibit matters more than the certificate
Everything a GC can check on a certificate traces back to one document: the insurance section of the subcontract, usually an exhibit. If the exhibit is vague, the review is vague. If it's specific, a reviewer can mark each line pass or fail.
Most exhibits are built from the same parts. Here they are, with how two public owners wrote them: Oregon DOT's subcontractor exhibit and Sonoma County's construction template, both published online.
1. Coverages and limits
The base layer is commercial general liability, auto liability, workers' comp with employer's liability, and an umbrella or excess policy that can stack on top of the primary limits.
Oregon DOT's exhibit asks for $1 million per occurrence and $2 million aggregate on an occurrence-form general liability policy, $1 million combined single limit on auto, statutory workers' comp and $500,000 employer's liability. It lets primary and excess combine to meet the minimums, as long as the excess is true following form.
Sonoma County scales the general liability limit to the job. Its template runs from $1 million per occurrence with $2 million aggregates on projects under $1 million, to $10 million across the board at $10 million and up. Trade contractors get their own, lower tiers: framing, mechanical and electrical trades carry more than other trades.
For the reviewer: a limit that scales with project size has to be checked against this project's tier, not a standard number.
2. Additional insured status
The exhibit names who must be added, for which operations, and on what form.
Oregon DOT names the state, the Oregon Transportation Commission and ODOT, and their people, on general liability and auto. It names the forms: CG 20 10 07 04 for ongoing operations and CG 20 37 07 04 for completed operations, or equivalent. It requires the endorsements to be submitted with the certificates.
Sonoma County names the county and its people for ongoing and completed operations, without naming form numbers in its standard language. It is blunt about proof: the template says a certificate alone is not sufficient for additional insured or primary and noncontributory status. See additional insured.
3. Primary and noncontributory
This wording makes the trade's policy pay first. Both exhibits require it: Oregon DOT on all liability coverage except workers' comp and employer's liability, Sonoma County as a stated requirement with an endorsement as evidence. See primary and noncontributory.
4. Waiver of subrogation
A waiver stops the trade's carrier from recovering what it paid from the GC or owner. Sonoma County requires a waiver endorsement on workers' comp and a written waiver in favor of its additional insureds. Oregon DOT's exhibit doesn't state one. See waiver of subrogation.
5. Aggregates and completed operations duration
Sonoma County requires the general aggregate to apply separately to each project, which is what a per project aggregate endorsement does. It also sets how long completed operations coverage must last after the work and guarantee period: one year under $1 million, two years up to $5 million, three up to $10 million, and five years at $10 million and up.
For the reviewer: duration requirements have to be diaried for years after the job closes. See completed operations.
6. Carrier quality and deductibles
Sonoma County requires insurers rated at least A:VII by A.M. Best, other than California's State Compensation Insurance Fund, and requires owner approval for deductibles over $25,000. Oregon DOT requires insurers authorized in Oregon and acceptable to the grantee.
7. Notice, renewal and delivery
Oregon DOT asks for 30 days' written notice before cancellation, material change, potential exhaustion of aggregate limits or non-renewal, and requires certificates before the trade performs. Sonoma County requires renewal evidence at least 10 days before expiration and certified policy copies within 30 days of a written request.
A checklist for your own exhibit
- Coverages and limits, scaled to the project if that's your practice.
- Additional insured: who, ongoing and completed, and the forms you'll accept.
- Primary and noncontributory on each liability policy.
- Waivers of subrogation on each policy you need them on, including workers' comp.
- Per project aggregate, if you need it.
- Completed operations duration in years.
- Carrier rating and deductible limits.
- Proof: certificate plus endorsements, before work, and renewals before expiration.
Then read every certificate against it. Our method paper How to read a COI against requirements shows how.
How we wrote this
This guide is built from two public construction insurance exhibits: Oregon DOT's Exhibit F, Subcontractor Insurance Requirements, and Sonoma County's Template 2 for construction and public works. Private subcontracts vary widely. Requirements are quoted as published; we have not checked whether either owner has since revised them. General information, not legal or insurance advice.
Sources
- Exhibit F: Subcontractor Insurance Requirements, Oregon Department of Transportation
- Insurance requirement Template 2 (construction and public works), County of Sonoma
- Contract Insurance Requirement: Tool, Templates and Tool Training, Oregon Department of Administrative Services
General information, not legal or insurance advice. Read your contracts and policies with your broker or attorney. COI Journal is published by Forsured, which sells construction insurance compliance software. How we keep editorial separate.
More from Reports
R-20Analyst briefResource Center
Two public owners, two insurance exhibits: Oregon DOT and Sonoma County compared
Public owners publish their insurance requirements, which makes them a rare window into how requirements are actually written. We read two side by side.
R-13White paperResource Center
What to require from any COI tool: a vendor-neutral specification
We don't rank software. But we can tell you what to ask for. This is a specification any COI tool, service or spreadsheet process can be measured against, with a way to test each line yourself.
R-01White paperResource Center
A certificate is not coverage: six ways contractor COIs fail project requirements
The certificate is the one document everyone collects and almost nobody can rely on by itself. Here is where it breaks, in the order we would check it.